Put the work side by side
Two refurbishment quotes can describe different projects, even when both start with “new bathroom” or “kitchen refurbishment”. Before comparing totals, check that each quote covers the same rooms, preparation, installation and finishing work.
Write a simple room-by-room list. Mark each item as included, excluded, optional or not yet clear. That list gives you useful questions to resolve before agreeing the work.
Separate supply from installation
Identify who supplies fixtures, fittings and materials. A quote for fitting a client-supplied kitchen is different from a quote that also includes buying it. Keep product choices and responsibility for deliveries visible, especially when another part of the work depends on them.
Read the preparation and finishing sections
Look beyond the main installation. Does the written scope describe removal, disposal, surface preparation, making good and decoration? If an item is not mentioned, ask whether it is included instead of assuming either way.
Check allowances and options
An optional line is not automatically part of the accepted scope. A provisional amount may also depend on a later decision or inspection. Record the version you accept, the selected options and any items still needing agreement.
A useful comparison explains the difference between the quotes, not just the difference between the totals.
Keep changes in writing
During a refurbishment, the scope may change as choices are made or existing conditions become clearer. Ask how a proposed change will be described, priced and agreed, and whether it affects the sequence of work.
Ask for the next step
Before accepting, check what information, access or selections are needed next. Discuss the proposed programme alongside the agreed scope rather than treating a requested completion date as confirmed.
- Is the same work included in each quote?
- Who supplies each major item?
- What preparation and finishing are included?
- Which options and allowances remain undecided?
- How will changes be agreed?
- What needs to happen before a start date can be confirmed?
This checklist is about understanding a project scope. It does not recommend a particular price or payment arrangement.
Have a project in mind?
Send OSPM your postcode, a description of the work and your preferred timing.
Tell us about your property