White kitchen cabinets with a wooden worktop

You have chosen the kitchen and found a floor you like. Which goes in first?

There is no sensible answer until the installer knows the flooring product and how it will be fitted. A plan that works for one floor can cause trouble with another. Before booking separate fitting dates, put the kitchen layout and flooring specification together.

For a South West London kitchen refurbishment, this is a useful decision to settle while comparing quotes. It affects who needs access to the room, where the floor finishes and which details must be agreed before materials arrive.

Start with the product, not just the colour

“Wood effect” describes an appearance. It does not tell the installer whether the product is click vinyl, laminate or something else, nor how it is fixed.

Send the exact product name, reference and installation instructions alongside the kitchen plan. If you have only selected a sample, ask the retailer for that information before placing the order. Include any proposed underlay or heating system so the installer can assess the complete arrangement.

A floating floor needs room to move

Some floors are installed as a floating system rather than bonded to the surface beneath. Fixed units and islands need particular attention.

For example, Quick-Step’s Vinyl Flex click instructions say heavy fixed objects should be fitted first, with the floor able to move around them. That is guidance for the specified product, not a universal instruction for every vinyl floor. The current instructions for your chosen range must decide the detail.

Read the manufacturer’s installation guidance, then ask your installer to explain the proposed sequence in the quote. Do not assume that a glued floor, tile floor and floating floor should all be treated alike.

Agree what happens at the edges

Ask where the visible flooring will stop. Mark the island, tall units, doorways and any areas where appliances sit on the plan. Discuss how plinths, trims and thresholds will finish those junctions.

An especially useful question is: “If the dishwasher needs replacing later, how will it come out?” Ask the kitchen fitter to check the appliance opening against the proposed finished floor level. It is easier to discuss that with drawings and product details than after the room is finished.

Include preparation and protection

The new finish is only part of the flooring brief. Ask who removes the existing covering, assesses the exposed surface and prices any preparation. If that assessment depends on lifting the old floor, the quote should explain how additional work will be agreed.

Also decide who protects completed surfaces while the remaining work takes place. In an occupied flat, tell the team whether the kitchen is on the route to other rooms. Include delivery access, storage space and the parts of the home that need to remain usable when discussing the programme.

Put the sequence in one shared brief

Before confirming dates, bring together:

  • The final kitchen plan, including the island and appliances.
  • The flooring product reference and installation instructions.
  • The proposed finished floor level and doorway details.
  • Responsibility for removal, preparation, fitting and protection.
  • Any decisions still waiting for a site assessment.

If different companies supply and fit the kitchen and floor, make sure each has the same information. A verbal assumption made by one team should not become an unexpected change for the other.

OSPM undertakes kitchen installation and refurbishment and flooring installation in South West London. If both are part of your project, send us your postcode, photographs and proposed products. We can discuss the work together before the installation scope and quote are agreed.

Have a project in mind?

Send OSPM your postcode, a description of the work and your preferred timing.

Tell us about your property