White tiled bath and shower with a recessed wall shelf

You like the new tiles. You do not like the idea of taking every old tile off the bathroom wall. Could the new finish go straight over the existing one?

Sometimes it can. But a tile-over-tile proposal needs an assessment of what is already there, how the extra layer changes the room and how the wet areas will be protected. For a bathroom refurbishment in South West London, settle those questions before comparing an overlay price with a strip-out price.

Start with the old installation, not the new colour

Bostik’s guidance on tiling over tiles makes the starting condition clear: the existing tiles need to be stable, clean, dry and fully bonded to the surface beneath. It calls for a detailed inspection and products suitable for the existing tiled surface.

Ask the installer what they can establish before work starts and what remains unknown. A neat grout line is not evidence of the condition behind it. Point out loose areas, cracking, recurring staining or previous leaks when requesting the assessment. Those observations belong in the brief, even if your main reason for changing the room is its appearance.

Avoid a quotation that simply says “tile over existing” without describing the preparation and the basis on which retaining the old finish is considered suitable.

Check what the extra thickness changes

An overlay moves the finished face of a wall or raises a floor. Bostik highlights the implications for doors, thresholds and furniture, and the need to check what weight the underlying surface can support. The appropriate limit depends on the actual construction; a generic online number is not a specification for your wall.

Walk through the proposed finish with the installer. Which details will need adjustment rather than being left until the last day?

  • The floor transition into the hallway and the bathroom door clearance.
  • The edges where new tiling meets an untiled wall or window reveal.
  • The position of fittings, shower-screen fixings and existing pipe penetrations.
  • Any panels or covers that still need to come off for maintenance.

In a compact Tooting bathroom, for example, keeping an existing vanity may make these junctions more relevant than the tile colour. Treat this as a layout check for your own room, not a reason to assume an overlay is unsuitable.

New tiles do not settle the waterproofing question

BAL’s guidance for wet areas explains that tiles, adhesive and grout alone do not inherently protect against water damage. A fresh tiled face is therefore not evidence that the shower area has an adequate waterproofing arrangement.

Ask how the proposed system deals with the wet area, junctions and penetrations, and what investigation is needed to establish the existing condition. If there is a leak or an unresolved damp problem, request an assessment of the cause before agreeing a cosmetic covering. The installer should specify a suitable system and follow its current instructions; this is not a recipe for choosing products separately and hoping they work together.

Compare two complete scopes

Retaining sound tiling can avoid some removal work. That does not establish the lower finished cost for every bathroom. Compare the assessment, preparation, waterproofing, fittings, edge details, waste removal and making good in each proposal.

Record what happens if opening a small area reveals a different background or damage. Who will explain the revised work, and how will you approve it? For a landlord or managing agent, identify the person authorised to make that decision before the room is out of use.

OSPM’s bathroom refurbishment service can be discussed as part of a single-room project or a wider refurbishment. To start an enquiry, send your South West London postcode, photographs of the existing room and the fittings you want to retain. Tell us about any known leaks or previous repairs, so the conversation starts with the condition as well as the finish.

Have a project in mind?

Send OSPM your postcode, a description of the work and your preferred timing.

Tell us about your property